Sand River Bridge 6 pm 14 July 2012 – Photo Gallery

The following photos taken by Bev Mortimer this evening show an extremely strong Sand River flowing down to the Kromme River at 6 pm, plus the build up of water at the bridge base beneath the road across, plus the status of water flowing towards and out of the  pipes beneath the bridge.

The Sand River Bridge is still open and traffic police will monitor it all night. The bridge will be closed as a cautionary measure if the water level and volumes from the river threaten the stability of the bridge at any stage.

 

See related article: https://stfrancischronicle.com/2012/07/14/sand-river-bridge-is-still-open-7-30-pm-14-july-2012/

Compare the status of bridge above to its status at 7.30 this morning (on 14 July): 

https://stfrancischronicle.com/2012/07/14/dam-formation-at-the-sand-river-bridge-causes-concern/

All articles written, all photos taken, plus all adverts designed, by the Editor and printed in the St Francis Chronicle are protected by Copyright.  Reproduction or copying of any part of the contents of this newspaper and its concept and design can only be done with the Editor’s written permission.

 

 

1 Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s